Asbestos Encapsulation in a High Ceiling Factory
To safely and efficiently encapsulate asbestos insulation board (AIB) located in the high-ceiling (4.5m) panels of a large factory building. This project aims to achieve this without the use of traditional scaffolding systems to minimize costs and operational disruptions.
Removal of Thermal Insulation Pipe Lagging
To safely remove thermal insulation pipe lagging containing asbestos, which is concealed behind the wall plaster in a large domestic property's bathroom that is undergoing conversion.
Asbestos Containing Roof and Hanging Tile Removal
The project objective is to safely remove asbestos-containing roof and hanging tiles from 24 domestic properties, ensuring full regulatory compliance, and minimizing disruptions to residents.